Engineering Initiative equipment needs
There are also other opportunities to leave your name on the
new engineering buildings, with gift naming opportunities
ranging from an earthquake shake tables to a 3D printer.
Specific equipment needs include the following. A gift of any
amount toward these needs would be greatly appreciated to
complete the furnishing of Cebula Hall and equip the new lab
building.
For Cebula Hall:
- Equipment for the CAD Lab: $177,762
- IT Equipment: $300,937
- Equipment for the Thermal Lab: $282,000
- Equipment for the Environmental Lab (Atomic
Absorption Spectrometer): $57,000
For the Industrial Laboratory Building:
- CNC Mill and Lathe: $15,586
- 3D Printer: $20,000
- Wind Tunnel: $100,000
- Earthquake Shake Table with Seismic
Controller and Hydraulic Distribution System:
$410,000
- IT Equipment: $174,000
- Asphalt and Concrete Testing Equipment:
$55,570
Please call Bianca Galam at 360-438-4366 if you would like to
make a donation for equipment.